![]() |
![]() |
![]() |
||
Projects |
Incinerator and Outdoor Kitchen
The incinerator will be located on the eastern border of the property away from the main building. Plans call for fire brick construction with a tall chimney. The kitchen, poured over a concrete floor, will be constructed of block and corrugated metal as designed by ServeHAITI volunteer Bob Balke, the clinic’s architect. As planned, the kitchen will provide the staff with ventilated cooking and food preparation areas, electricity and running water. Construction will be performed by ServeHAITI volunteers while also providing work for local Haitian workers. Both the incinerator and kitchen should be operational by the end of 2009. |
|